December 14, 2012

project bathroom de-80's

Progress has been moving along on operation "fix up our house before baby #2 arrives". It's slow-going but it's happening so that's what matters! The bathroom was first to get started. Ripping out the 80's strip of tile was probably the most gratifying home reno I've ever done! Closely followed by removing the frosted bird shower doors. And the new paint looks fab, though isn't pictured. Left to do is: 1)Flooring 2) Install Vanity 3) Replace Toilet 4) Replace light fixture 5) Hang Towel Bars/Hooks. The changes in our bathroom are relatively minor but here's a little sneak peek.

No comments: